- Chris Ernst – Council Run: Below are pictures/Videos of the aftermath of one or more hard stormwater events from 6/9/21. The collar that was installed to “fix” the joint of the slipline after construction inthe fall of 2020 was forcefully removed during the rain event on 6/9/2021